The questions every project manager asks us
We have grouped them the way they arrive: lead times, pricing, scope, samples and export. If yours is not here, write to us and we will add it. Our plant is in Heshan, Guangdong, China and we ship through Nansha and Yantian.
The date that matters is the one on site, not ours. So we always talk about delivery into destination.
We work with 30 to 45 days per typical guest room, counted from shop-drawing approval and delivery of the finish materials. That is a reference for a standard 22 to 26 m² room. A suite with natural stone, or a public-area package, runs on its own schedule. What we do not do is promise dates we cannot hold.
No. The 30 to 45 days are workshop production, with the module pre-assembled, packed and ready to load. Transit is added according to destination: around 7 to 12 days by sea to the Americas, 25 to 35 days to the Far East. In the quotation we give you both figures separately.
It is normal on large projects. We can split the lot by room block or by zone of the building, so the first floor opens while the last is still being produced. There is a 25 % surcharge for split lots.
It is processed as an RFI, with a number and a date. Until the cutting list is frozen, changes are absorbed at no cost if they do not affect work already done. After the freeze, each change is quoted separately. That is why we push so hard to close the drawing before we start.
No cost for the first proposal, and no small print: we tell you what is in it and what is not.
Nothing. The first technical proposal, with the scope by line item and a price range, is free and reaches you within 24 hours. We do not charge for finish samples or the mock-up room either, during the tender stage.
Per module and per line item, never per linear metre. Price depends on the timber species and finish, the stone or laminate, the machining, the number of machined parts and the degree of pre-assembly. With the drawing and the BOQ we can give a closed range within 24 hours; a fixed price per line item needs the approved shop drawings.
We quote in euros and, if you prefer, leave the price open in your local currency at the rate on the quotation date. On large projects running over 90 days of production, it is common to fix part of the amount in euros to protect the margin.
50 % on order signature and 50 % before shipment. The balance is released against the module verification video or against an SGS / BV inspection, whichever you prefer. We accept bank transfer and documentary credit for export business.
Where our part starts and where it ends, written plainly.
No. Our scope is manufacturing, 1:1 pre-assembly in the workshop, barcode labelling, packing and delivery to the agreed port. What we do deliver is the mounting sequence for each module in drawing form and the test video, so your crew works from factory information instead of assumptions.
Only when you ask us to, and we say so in writing with the manufacturer’s name. Fixed case goods, loose guest-room furniture and public-area equipment are made by us with our own crews.
Yes. We work with Coil, Simmons and Module, and with whatever comfort panelling you have assigned. If you would rather we proposed alternatives, we will, with the technical sheet and the price difference.
On most projects, yes. But there are always four or five exceptions: the mock-up room, the suites, the accessible room, a smoking room if there is one, and the occasional VIP. We build them with the same crew and the same quality control, and we document them separately.
Before you produce 300 rooms, it is worth having touched the material.
Yes, at no cost. We send a physical sample set with wood veneer, a finish panel, a stone sample and a metal profile, plus the technical sheets. You carry the cost of shipping, unless the project is awarded to us, in which case we do.
It is the best way to validate a project of 100 rooms or more. We manufacture one complete unit in its real finish and it stays on site as a quality reference and as a spare. We recommend it whenever the volume justifies it and the programme allows.
That depends on you, not on us. In our experience it runs 7 to 15 days between the sample set arriving and the shop drawings being signed. Which is why it is worth requesting the samples in the same week as the first proposal rather than a month later.
Five countries, four currencies, one point of contact.
Regularly to Spain, Portugal, France, Mexico, Colombia, Chile, Peru, the Dominican Republic and the United States. We ship from Nansha (Guangzhou) and Yantian (Shenzhen). We have direct experience of import clearance with phytosanitary certification in Mexico, Chile and Peru, which are the procedures that most often jam.
EXW, FOB, CIF and DDP, depending on where you want the responsibility to end. FOB Nansha or Yantian is the usual choice; for Europe, DDP is often simpler for the client if they have no customs broker of their own. We tell you which one suits you in the offer.
If you contract DDP, we handle it with a forwarder at destination. If the Incoterm is FOB or CIF, the import is yours, but we hand over the full documentation set: commercial invoice, packing list, bill of lading and the ISPM 15 phytosanitary certificate where it applies.
Document it with photographs. When the container is opened, photograph any damage before signing the delivery note and send us the images with the package number. We answer documented claims within 48 hours. Parts damaged in transit are replaced or credited against the next delivery.
Write to us. We answer within 24 hours
If the question is technical, send the drawing and the question together: that way you do not get a generic answer. If it is about price, send the BOQ even if it is half finished.