Engineering · from the architectural drawing to the part that goes into the building

Engineering is not the pretty adjective: it is the tolerance. On this page we show how a shop drawing is built, which materials resolve a junction, and what documentation you can demand and file.

01 / Shop drawing process
Drawing chain

Six documents before anything reaches the machine

Each stage has a signed deliverable. We do not move to the next drawing without the previous one approved, because on a 300-room project a 3 mm error repeated 300 times is not an error: it is a building.

  1. 01

    Site coordination drawing

    A cross-check of the architectural drawing against the real position of the building services: HVAC, plumbing, audiovisual and low voltage. Every clash is marked before it reaches the workshop.

    Issued in 5 days · PDF + DWG

  2. 02

    Shop drawings

    Elevation, plan and section of every module, with dimensions, axes and part references. The general tolerance is set at ±1 mm between adjacent elements.

    Tolerance ±1 mm · ISO 2768

  3. 03

    Cutting list and cut schedule

    Every panel with its code, net size, grain direction, edge and finish. The cutting list reaches the workshop with the same numbering you will see on site.

    Unique coding per project

  4. 04

    Services layout

    Cable routing, recessed lighting, sockets and mechanisms. No duct is cut on site: everything runs through the channel shown in the cutting list.

    Coordinated with services

  5. 05

    Construction detail

    The detail of how materials meet, with the chamfer, the joint and the sealant specified. This is where millimetres are won or lost.

    Scale 5:1 · critical detail

  6. 06

    Approval and freeze

    The drawing is signed by your architect and the site supervision. From that point on, any change is processed as an RFI, not by phone call.

    RFI with a number and a date

ELEVATION · BUILT-IN WARDROBE 2400P-03 · SCALE 1:20
15002260DWG 03 · ELEVATIONSCALE 1:20
DETAIL · THREE-MATERIAL JUNCTIONDET. 07 · SCALE 5:1
SANDED OAKSS 1.5SINTERED 12JOINT 1.5 mmDET. 07 · SCALE 5:1
What you receive
  • DWG + PDF folder of shop drawings
  • XLSX cutting list with part codes
  • Construction details at 1:5 scale
  • Services and cabling layout
  • RFI log with numbers and dates
Request the documentation scope
02 / Material integration
One junction, three materials

The joint is the project

The quality of hotel furniture does not show in the photograph. It shows in the 1.5 mm line where timber, steel and stone meet. That is where the millimetre is won or lost.

Wardrobe elevation from the project specification, dimensionedRender
PL-A20 · MACRO4:3

Wardrobe elevation from the project specification, dimensioned

Shop drawing

Headboard node detail with sectionsRender
PL-A20 · DETALLE4:3

Headboard node detail with sections

Shop drawing

CM-01

Solid timber veneer

Solid timber, high-density plywood or moisture-resistant MDF at 18 mm, always sealed on all six faces. The grain is oriented to follow the light in the room.

  • Controlled vertical grain
  • Six faces sealed
  • Moisture-resistant core
CM-02

304 / 316 stainless steel

Sections, mitres and hardware in brushed stainless with a satin bronze PVD coating. In a coastal environment, 316 with anti-corrosion treatment.

  • Satin bronze PVD
  • 316 in salt air
  • Bespoke profiles
CM-03

Sintered stone

Thicknesses of 6, 12 and 20 mm over an aluminium honeycomb or a high-density cardboard honeycomb core. Edge rectified and bevelled.

  • 6 / 12 / 20 mm
  • Absorption < 0.05 %
  • Rectified edge
03 / Coastal and high-humidity environments
Resistance to the environment

A beach hotel is not a city hotel

Salt, humidity and coastal sun attack the same module three times a day. We specify the finish for that climate, not for a showroom.

Anti-corrosion hardware

AISI 316 on the steel hardware in contact with the seafront, with a PVD finish rated to 200 hours of salt spray.

Fully closed edges

Open-pore sealing and 2 mm edge banding on all six edges. Unclosed timber is timber that swells in high season.

Continuous shadow gap

Perimeter joints let the joinery move without humidity reaching the inside of the module.

Lead time without a climate penalty

Sea-freight packing goes out with desiccant and shrink film. No condensation on discharge, even if the voyage crosses two climate zones.

PL-A214:3

316 stainless hardware with anti-corrosion treatment on a Caribbean coast resort project

Saline environment · real finish after 18 months

PL-A221:1

Edge sealed with 2 mm band on all six sides

Edge banding detail

PL-A231:1

Sea-freight packing with desiccant

Condensation risk

04 / Declared tolerances
Contractual document

These tolerances go into the contract

They are not internal to us: they are annexed to the shop drawing and signed. During production, any piece out of range is rejected, not noted.

ElementToleranceReference
General module dimensions± 1 mmContract
Door and drawer clearance2 – 3 mmContract
Flatness between adjacent modules≤ 1 mmContract
Plumbness of a floor-to-ceiling panel≤ 1.5 mm / mContract
Sintered stone edge chamfer1 mm × 45°Per drawing
Joint between materials1.5 mmDetail 07
Clearance below the false ceiling10 mmPer project
05 / Reports and conformity
Verifiable by a third party

If the site requires it, the factory has it

We receive the inspector your developer appoints. No cost during the production phase, and direct access to the line while the visit lasts.

SGS / Bureau Veritas inspection

Verification at the factory, with the sampling plan agreed in advance.

Fire reaction report

Foam, upholstery and textiles with documented classification.

Material certificates

Every line item with its certificate and its batch number.

Traceability per line item

From the cutting list to the package, every piece knows where it came from.

«An approved shop drawing without a visit to the factory is a hypothesis, not a signed document.»

Technical direction · ENIS Hotel Furniture
Automatic panel transport between the cutting line and machining
PL-A244:3

Automatic panel transport between the cutting line and machining

Our own factory photograph

PL-A254:3

Fire and emissions test report archive, indexed by material reference

Documentation per line item

06 / Fire and environmental standards
Tests and certifications

The tests the site will ask you for, already covered

In a regulated market furniture is not bought from a catalogue: it is bought against a standard. Our upholstery, foams and boards are ordered with a fire classification and an environmental certification, and those reports are issued per line item, not per company.

FIRE STANDARDEN 1021 · BS 5852

Fire reaction · BS 5852 / CAL 117

Flame-retardant foam at 28 to 35 kg/m³, textiles with flame treatment and self-extinguishing foam in the core. We issue the test report for each foam reference and each fabric, with a date and a named laboratory, so you can attach it to the site supervision file.

  • Flame-retardant HR foam · report per reference
  • Contract fabrics with flame treatment
  • Mattresses and flame-retardant protection panels
  • Current report · less than 24 months old
ENVIRONMENTAL STANDARDE0 · CARB P2

Emissions · E0 / CARB Phase 2

E0-class boards and solvent-free sealants in the finishes specified for guest rooms. We present our supplier’s CARB P2 report for the boards, which is the standard the inspection reviews in California and in most of the American market.

  • E0-class boards with a current report
  • Solvent-free varnish and sealants
  • Supplier traceability for the boards
  • Material declaration (VDS) per line item

The tests are carried out in an accredited laboratory on the material that enters production, not on a catalogue data sheet

07 / Mock-up room
A 1:1 sample

If you are going to repeat 200 rooms, validate one first

The mock-up room is one complete unit, in its real finish and assembled at destination. It does three things at once: it approves the finish, it times the installation, and it leaves a spare unit on site.

What it includes

One millwork module, one set of loose furniture and one bathroom, in the same finish and the same hardware grade as the rest of the run.

When it is built

After shop-drawing approval and before the first lot ships. The manufacturing time is deducted from the order if the project is awarded to us.

Where it goes

To destination, as the first unit. If your project is already on site, it stays there as a quality reference and as an immediate spare.

Request a mock-up room
Reference pilot room with the signed finishRender
PL-A304:3

Reference pilot room with the signed finish

Catalog render

Finish comparison between the board sample and the finished piece after the first coatRender
PL-A3116:9

Finish comparison between the board sample and the finished piece after the first coat

Catalog render

08 / Reference renders
Illustrations, not our own work

These four are not photographs of a site

The images in this section are renders from the manufacturer's visual catalogue, so that you can see the room typology, the scope of the set and the point where the joint is measured. They are not photographs of an executed project. The real work, with its name and its city, is in the project library.

European boutique style, with solid timber and a carpetRender
PL-A124:3

European boutique style, with solid timber and a carpet

Catalog render

Bright room with light timber and a framed pictureRender
PL-A134:3

Bright room with light timber and a framed picture

Catalog render

Dark-toned suite with green upholsteryRender
PL-A144:3

Dark-toned suite with green upholstery

Catalog render

Classic-style room with a lattice screen and a round lampRender
PL-A034:3

Classic-style room with a lattice screen and a round lamp

Catalog render

09 / Next step
Bring your drawings

You get the cutting list and the tolerance, not a promise

Send us the guest room drawing and the BOQ. Within 24 hours you receive the design scope, the list of parts and the points where we need your decision.