Skip to content
Finished hotel room assembled in the Heshan factory showroom: solid timber headboard and bedside tables, desk with concealed cable management.
Direct manufacturing · Heshan, China

Contract furniture manufactured in Heshan, China

01/ 04
Show more
Shop drawings ±1 mm QC at 4 stages Exports to 50+ countries
30–45days
Production lead time per typical guest room
1:1
Pre-assembled and tested in our own factory
±1mm
Tolerance on shop drawings
4stages
Quality control before shipment

Our own production, from start to finish

Laser cutting, edge banding, CNC machining, finishing, assembly and quality control under one roof: 150,000 m² of production floor, 6,000 m² showroom and 1,000+ technicians and engineers between the drawing and the container. We manufacture with HOMAG (Germany), Schelling (Austria), Biesse (Italy), on a plant planned by Schuler (Germany).

See the factory
Panoramic view of the production hall of the Heshan plant in Guangdong
CNC machining line at the Heshan plant
Panel machining centre at the Heshan plant

The technical difference

100 % pre-assembled in the workshop

Furniture fails on site, not on paper. Every module is assembled and fully disassembled in the factory before it is packed: plumbness, door clearances, edge alignment and hardware operation are all checked there.

Read more

Sintered stone

Thickness 6 / 12 / 20 mm, 1 mm bevelled edge and water absorption below 0.05 %. Matt surfaces that do not reflect lobby lighting.

Sealed solid timber

Oak, walnut and ash with open-pore sealing on all six faces and pre-sealed edges, built for coastal suites and high-humidity climates.

PVD stainless steel

304 and 316 stainless with a satin bronze PVD coating and hardware with anti-corrosion treatment for saline environments.

Markets with delivered work

Saudi Arabia

3,410 units · 6 projects

United States

942 units · 3 projects

Qatar

532 units · 2 projects

United Arab Emirates

492 units · 2 projects

Canada

464 units · 1 project

Malaysia

452 units · 2 projects

New Zealand

380 units · 2 projects

Australia

311 units · 2 projects

Vietnam

300 units · 1 project

Sri Lanka

300 units · 1 project

United Kingdom

245 units · 2 projects

Indonesia

155 units · 1 project

India

139 units · 1 project

Thailand

80 units · 1 project

Our product range

View all
Catalog render of a standard room with a large windowRender

Standard room with a window and solid timber

Render from the project catalogue. Not a photograph of delivered work.

Catalog render of an open wardrobe next to a stone-clad bathroomRender

Open walk-in wardrobe and a stone-clad bathroom

Render from the project catalogue. Not a photograph of delivered work.

Catalog render of a floor-to-ceiling wardrobe with a ventilation grilleRender

Floor-to-ceiling timber wall with a continuous front

Render from the project catalogue. Not a photograph of delivered work.

Catalog render of a suite bathroom with a vanity and back-lit mirrorRender

Suite bathroom with a back-lit vanity

Render from the project catalogue. Not a photograph of delivered work.

Catalog render of a junction between solid timber and sintered stoneRender
Junction of solid timber, a grille and sintered stone at the vanity run.
MAT-01

Flame-retardant foam

Density 28–35 kg/m³ with certified flame-retardant treatment for hotel use. Test report available on request at project stage.

MAT-02

Sintered stone

Thickness 6 / 12 / 20 mm, 1 mm bevelled edge and water absorption below 0.05 %. Matt surfaces that do not reflect lobby lighting.

MAT-03

Sealed solid timber

Oak, walnut and ash with open-pore sealing on all six faces and pre-sealed edges. Built for coastal suites and high-humidity climates.

MAT-04

PVD stainless steel

304 and 316 stainless with a satin bronze PVD coating. Hardware with anti-corrosion treatment for saline environments.

Lobby of the Zhuhai Valley Resort project, Guangdong, China

Project highlight

Zhuhai Valley Resort

Lobby, suites and guest rooms delivered in Guangdong. One of the six Chinese projects we show with open photography, unretouched.

Explore our projects

Our own plant in Heshan, Guangdong

150,000 m² of our own floor, 6,000 m² showroom and 1,000+ technicians and engineers between the drawing and the container.

Send drawings or a BOQ and we come back with price and lead time per line item, at no cost.

Send the BOQ for review
Aerial view of the Heshan plant in Guangdong
Our delivered projects
Lobby bar of the Yangshuo Ji Hotel project, Guangxi, China

Yangshuo Ji Hotel

Lobby bar, reception and guest rooms · Guangxi, China

Common area of the Hanting Hotel project, China

Hanting Hotel

Guest rooms and common areas · China

Bathroom delivered in the Ankang project, Shaanxi, China

Ankang Apartment Project

Guest rooms and bathrooms · Ankang, Shaanxi, China

Shop drawings and material samples flat-layRender

Request a quote

With the architectural drawing and an approximate BOQ — or simply with the photos and the number of rooms — we come back with a price range per line item and a realistic delivery date. Technical answer within 24 hours, in English and Spanish.

The button opens your email client with the subject and the body already written. You can also reach us on WhatsApp.

01 / From drawing to site
How we work

Six stages, each one with a deliverable

Every stage closes with a document you can archive or enforce. If something moves, it moves against a drawing that backs it.

  1. 01

    Scope intake

    Architectural drawings, BOQ or a reference schedule. We detect services clashes before they turn into a change on site.

    Returned in 48 h · No cost

  2. 02

    Shop drawings

    Part-by-part breakdown with dimensions, material section, finish note and hardware schedule. Every sheet is reviewed with your architect.

    7–10 days · Tolerance ±1 mm

  3. 03

    Sample and approval

    A physical finish sample or a mock-up of one complete unit before the production run. No cost during the tender stage.

    Mock-up room optional

  4. 04

    Manufacturing and pre-assembly

    Batch production with quality control at four stages. Every module is assembled and disassembled in the workshop before it leaves.

    4 QC stages per line item

  5. 05

    Packing and export

    Silicone cotton, corner protectors, five-layer corrugated board and fumigated timber pallets. Every package is labelled with the room code.

    Sea or air freight · Incoterm to be agreed

  6. 06

    Delivery and documentation

    Delivery notes carrying the room code, a maintenance manual and material certificates archived per line item.

    Documentation per line item

02 / Frequently asked
Straight answers

The seven questions we are asked most

If yours is not here, write to us. We would rather answer before you sign than find out afterwards.

See the full list