Send us the drawings. You get price and lead time per line item.
The first technical proposal is free and reaches you within 24 hours. You do not need a closed list: with the drawing, the number of rooms and the target date we can already give you a realistic range.
RenderGuest room drawings
DWG, DXF, RVT, IFC, SKP or PDF. The plan, the section and the elevation are enough.
BOQ or schedule of items
Excel or PDF. Even if it is grouped by chapter rather than by manufacturer.
Number of rooms
The simplest figure you have, and the one that tightens the price range the most.
Target date on site
Not the opening date: the date the furniture has to be in place.
Required certifications
Fire reaction, emissions or whatever the site supervision requires.
Confidentiality
The drawings you send us are treated as confidential project information. They are not shared with third parties, not used as a portfolio and not shown to other companies quoting the same job. If your policy requires it, we sign an NDA before opening a single file.
Three rules we do not negotiate with ourselves
On a contract project, the difference between one supplier and another often is not the price: it is what happens when something does not add up.
- 01
24 hours, or we say so
If we have not replied within 24 hours, it is because we have not looked at it. If the answer needs an engineering calculation we cannot do in 24 hours, we tell you that instead of leaving you waiting.
- 02
If we do not do it, we say so
Not every project fits our capacity or our technical team. If yours is not one of them, we say so in the first reply and point you towards someone who does it.
- 03
The drawing comes before the price
We do not quote blind and we do not give a price per linear metre that later cannot be sustained. First the cutting list, then the number.
Data controller
Enis Hotel Build, Heshan City, Guangdong, China. Shipping through Nansha (Guangzhou) and Yantian (Shenzhen).
Purpose
Handling your quotation request, preparing the technical proposal and maintaining the project communication.
Retention
Data and files are kept for 24 months from the last communication and are deleted on request within that period.
By sending this form you accept our privacy policy · we use no advertising or tracking cookies